May 2007


The footing will be poured Wednesday, May 9.

Footing Rebar

The rebar will add strength so that the 12′ tall side walls do not fall over. The footing wil be 5′ wide and 16″ tall. It’s big ! ; )

cke_excavation_day_2_.jpg